DOT 4

Results: 1273



#Item
931Earthquake engineering / Structural engineering / Seismic retrofit / Limit state design / Retrofitting / Structural failure / Seismic analysis / Civil engineering / Construction / Engineering

MEMOS TO DESIGNERS 20-4 • JUNE[removed]LRFD 20-4

Add to Reading List

Source URL: www.dot.ca.gov

Language: English - Date: 2014-07-01 18:08:09
932Product lifecycle management / Project management / Project manager / Business / Meetings / Joint application design / Management / Construction / Building engineering

FACILITATED PARTNERING To be used when requested to by District or on very large and complicated jobs REVISED[removed]SP2000-4 Partnering will be required on this Contract. It will include Mn/DOT, the Contractor, its Subc

Add to Reading List

Source URL: www.dot.state.mn.us

Language: English - Date: 2007-02-09 15:32:04
933Light rail in Minnesota / Northstar Line / Fridley / Target Field / Big Lake / Elk River / Anoka / Hiawatha Line / NCDA / Minnesota / Transportation in Minnesota / Commuter rail in Minnesota

NORTHSTAR CORRIDOR RAIL PROJECT Environmental Assessment/Draft 4(f) Evaluation December 22, 2005 Minnesota Department of Transportation in cooperation with the

Add to Reading List

Source URL: www.dot.state.mn.us

Language: English - Date: 2006-02-07 14:06:24
934Bureau of Transportation Statistics / United States / Federal Advisory Committee Act / Office of Management and Budget / Federal Register / Dangerous goods / United States Department of Transportation / Paperwork Reduction Act / Department of Transportation / United States administrative law / Government / Research and Innovative Technology Administration

[removed]Federal Register / Vol. 78, No[removed]Monday, November 4, [removed]Notices NEW SPECIAL PERMITS—Continued Application

Add to Reading List

Source URL: www.rita.dot.gov

Language: English - Date: 2013-11-04 16:06:29
935Physical geography / Hydraulic engineering / Aquifers / Groundwater / Liquid water / Water well / Stormwater / Spring / Water management in Greater Damascus / Water / Hydrology / Earth

GROUNDWATER, WELLS AND SPRINGS EVALUATION Wisconsin Department of Transportation Factor Sheet C-4

Add to Reading List

Source URL: www.dot.wi.gov

Language: English - Date: 2013-05-15 10:17:05
936

Expenses for Feed Purchased: [removed]Census of Agriculture 1 Dot = $4,000,000

Add to Reading List

Source URL: www.agcensus.usda.gov

- Date: 2012-02-14 12:10:29
    937

    MEMOS TO DESIGNERS 20-4 • JUNE[removed]LRFD 20-4

    Add to Reading List

    Source URL: www.dot.ca.gov

    - Date: 2014-07-01 18:08:10
      938Electronic toll collection / Intelligent transportation systems / Sustainable transport / High occupancy/toll and express toll lanes / Congestion pricing / Traffic congestion / CORSIM / Ramp meter / Interstate 4 / Transport / Land transport / Road transport

      DOT_RITA_LONG-signature_b&b_cs3

      Add to Reading List

      Source URL: www.rita.dot.gov

      Language: English - Date: 2012-10-03 14:04:45
      939Trucks

      Detailed Explanation of s[removed]9m)(a)4. ‐ Raw Forest Products Permit on  vehicles or vehicle combinations with 6‐axles and a maximum gross vehicle  weight of 98,000 lbs, during Spring Tha

      Add to Reading List

      Source URL: www.dot.wisconsin.gov

      Language: English - Date: 2013-03-08 14:53:03
        940Transportation in Minnesota / Commuter rail / Metro Light Rail / Commuter / MBTA Commuter Rail / Metro-North Railroad / Santa Clara Valley Transportation Authority light rail / Metrolink / Metro Transit / Transportation in the United States / Rail transportation in the United States / Commuter rail in Minnesota

        4 The purpose of this section is to provide guidelines to ensure consistency during the

        Add to Reading List

        Source URL: www.dot.state.mn.us

        Language: English - Date: 2004-08-03 17:13:10
        UPDATE